XML Persian Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Pourakbari-Kasmaei M, Rashidi-Nejad M, Piltan S. A New Hybrid Heuristic Technique for Unit Commitment and Generation Scheduling. Journal of Iranian Association of Electrical and Electronics Engineers. 2010; 7 (2) :41-49
URL: http://jiaeee.com/article-1-213-en.html
Abstract:   (1579 Views)

This paper proposes a novel technique for solving generation scheduling and ramp rate constrained unit commitment. A
modified objective function associated with a new start-up cost term is introduced in this paper. The proposed method is
used to solve generating scheduling problem satisfying SRR, minimum up and down time as well as ramp rate
constraints. Two case studies are conducted to implement and show the effectiveness of the proposed method. One is a
conventional 10-unit system and its multiples while the other is a 26-unit system with 24-h scheduling horizon. A
comparison between the results of the proposed technique with those of some methods demonstrates a significant
improvement.

Full-Text [PDF 993 kb]   (697 Downloads)    
Type of Article: Research | Subject: Power
Received: 2017/02/21 | Accepted: 2017/02/21 | Published: 2017/02/21

Add your comments about this article : Your username or Email:
CAPTCHA

© 2020 All Rights Reserved | Journal of Iranian Association of Electrical and Electronics Engineers

Designed & Developed by : Yektaweb